Menu

Old Spanish Trail Crossing

Community Shopping Center

This project offered an opportunity for Optimus to apply our grading expertise as there were many unique aspects to accommodate. This retail project is anchored by a Target Store and had topography relief of approximately 60 feet across the Target Store, overlooking the Rincon Mountains.

Optimus provided extensive civil engineering services including the design and relocation of a historic trail and also the design of a pedestrian underpass. The 29 acre shopping center opened in summer of 2004 and features additional anchors such as Ross Dress for Less, Bed Bath & Beyond and Office Max.

Type
Mixed-Use/Retail Development
Client
Barclay Group
Location
Tucson, AZ
Specs
29-Acres
210,583 SF
Completion
Spring 2004
Services
  • Site Feasibility/Due Diligence Studies
  • A.L.T.A., Boundary and Topographic Surveys
  • Legal Descriptions and Exhibits
  • Prelim/Final Plats and Maps of Dedication
  • Hydrology Studies and Drainage Reports
  • Wash Mitigation Analysis, Bank Protection Plans and 404 Permitting
  • Stormwater Pollution Prevention Plans
  • Grading, Paving and Drainage Plans
  • Water, Fireline, Sewer (On & Offsite Plans)
  • Dry Utility Coordination
  • Offsite Road and Drainage Improvement Plans
  • Construction Assistance, Spot Inspections and Completion Certifications