Menu

Tombstone High School

High School Campus with Engineering Challenges

In 2002, Optimus was contracted by Orcutt/Winslow to provide civil engineering services for a new high school campus that would replace the existing high school. Tombstone which is located ~80 miles southeast of Tucson had extensive topography relief. Among the challenges, the school campus sat at ~4,000 feet above sea level on a ridge that had to be flattened out to accommodate the buildings. Cut and fill slopes ranged from 10-50 feet in height. Since Tombstone did not have enough supply in its water system, a storage tank was constructed on the face of the mountain for the school’s potable water and fire flow needs. To date, Tombstone High School was one of the most challenging projects that Optimus has encountered for a school campus.

Type
Educational Facilities
Client
Orcutt/Winslow
Location
Tombstone, AZ
Completion
2003
Services
  • A.L.T.A., Boundary and Topographic Surveys
  • Legal Descriptions and Exhibits
  • Hydrology Studies and Drainage Reports
  • Stormwater Pollution Prevention Plans
  • Grading, Paving and Drainage Plans
  • Water, Fireline, Sewer (On & Offsite Plans)
  • Offsite Road and Drainage Improvement Plans
  • Construction Assistance, Spot Inspections and Completion Certifications